Business premises

Commercial EICR in Chesterfield and north Derbyshire

Commercial EICR, also called fixed wire testing, is electrical test and inspection of your building's fixed installation. Most pages say the law requires it every five years, or every three for an office. It does not. The Electricity at Work Regulations require you to maintain the installation so it does not become dangerous, and to decide, record and review how often it is checked.

No interval is fixed in law. Recommended maximums come from BS 7671 guidance, not statute.

Commercial

Where is the property?

The postcode tells us whether we cover you.

So we can check you are in our area
If your current report still has months to run, we would rather tell you that than book you in early.

What you are getting

Fixed wire testing law: maintenance, not an interval

Maintain the installation so it does not become dangerous

That is the obligation under the Electricity at Work Regulations 1989. A duty of outcome, not a schedule, which is why it names no interval.

Decide the frequency, and write it down

HSE's position: test often enough that deterioration is unlikely to lead to danger. You decide, record it, and adjust as faults appear.

Recommended maximums come from guidance, not law

BS 7671 gives recommended maximum intervals by premises type. Worth following. Not a legal requirement, whatever you are told.

Insurers and leases often set one anyway

In practice the binding interval is usually contractual: an insurance condition or a repairing clause. Check what yours says before assuming a number.

What you get

A report records circuits, codes and limitations

The verdict is the least useful part. What matters is the schedule of test results behind it, the coded observations, and an honest record of anything the inspection could not reach.

A ticked box and nothing else is a verdict with no working shown. Worth knowing before you accept one, whoever arranged it.

Electrical Installation Condition ReportBS 7671

Schedule of circuit details

1Lighting, ground floor6A Type B
2Lighting, first floor6A Type B
3Sockets, ring final32A Type B
4Cooker32A Type B
5Immersion heater16A Type B
6Outbuilding supply20A Type B

Observations and classification codes

  • C2No RCD protection to the outbuilding supply.
  • C3Consumer unit is not of a non-combustible construction.

One C2 present, so this report reads unsatisfactory. The C3 alone would not have made it so.

An illustration, not a real report. No address, reference or signature: those belong to a real inspection.

What the law says

Statute sets no commercial inspection interval

The first row is the important one. There is no statutory inspection interval for commercial premises, and a page telling you otherwise is either mistaken or selling you something.

Electricity at Work Regulations 1989Duty to maintain so as to prevent danger. No interval is set.
Inspection frequencyRisk-based. The duty holder decides it, records it and reviews it.
BS 7671 guidanceRecommended maximum intervals. Guidance, not statute.
Insurance or lease conditionsFrequently the interval that actually binds you

Sources

This describes the law in England. The Welsh and Scottish positions differ, Scotland's repairing standard also covers portable appliances, which the England duty on private landlords does not. It is general information, not legal advice. Last checked against the primary sources on 27 August 2026.

How it works

Fixed wire testing needs planned isolation

Fixed wire testing means planned isolation, and isolation means downtime. Scheduling is usually harder than the electrical work.

  1. Tell us the premises and the constraint

    Premises type, rough board count, single or three phase, and when you can be without power. That last answer shapes everything else.

  2. We match an electrical compliance specialist to the installation

    A small trade unit and a multi-board industrial installation are not the same job, and the inspection is scoped accordingly.

  3. Isolation is planned, sometimes in phases

    Larger installations are often done over several visits so no shutdown takes the whole site. Agree that up front, not on the day.

  4. Report, schedule and a recommended interval

    The report carries a recommended next date. That is a better basis for your risk decision than any rule of thumb.

Gloved hands taking a reading with a red test probe at a multi-way commercial distribution board, several rows of single and multi-pole circuit breakers wired in grey and blue

Areas covered

We cover eight towns across north Derbyshire

Chesterfield's trade and industrial units, and the commercial premises around junction 28 at South Normanton.

Coverage check

Do we cover your postcode?

Type the first part, like S40 or DE45. No need for the whole thing.

Just the outward code is enough

Outside those eight? What an EICR costs and covers across Derbyshire.

Standards

The standards every inspection is carried out to

An EICR is only as good as the person signing it. Every inspection here is carried out to these standards, and each one is checked against the issuing body's own register rather than taken on trust.

Qualified to inspect, not just to install

Inspecting an existing installation is a separate qualification from wiring a new one. A good installer is not automatically the right person to sign a report.

Registered with a competent person scheme

Checked on the scheme's own public register, not a badge on a website.

Public liability insurance, in date

We check the certificate and the expiry date, not just that one exists. A lapsed policy is the most common reason to turn someone away.

You get the test results

Not just a pass or fail. The report lists each circuit and the readings taken, which is the part worth checking.

Working to the current standard

BS 7671 as amended in 2026. That amendment changed which findings make a report unsatisfactory, and not everyone has caught up.

Reviews you can read

Not a star rating with no detail behind it. We publish no figure of our own, because we have none to publish yet.

Scheme registration and insurance details come with your quote, so you can check them against the public register yourself. How we choose electricians sets out every check, including what gets someone turned away.

Next step

Arrange commercial fixed wire testing

Premises type, board count, and when you can be without power. If your insurer has set an interval, say what it is.

Arrange an inspection

Questions

Commercial EICR and fixed wire testing questions

Is commercial EICR or fixed wire testing a legal requirement every five years?

No, and this is worth being clear about because it is stated as fact almost everywhere. The Electricity at Work Regulations 1989 require you to maintain the installation so it does not become dangerous. They set no interval. Recommended maximum intervals come from BS 7671 guidance.

Then how often should we have one?

HSE's position is that testing should be often enough that there is little chance of deterioration leading to danger, with the frequency decided, recorded, and adjusted according to the faults found. The report on your installation will carry a recommended next date, which is a better starting point than a general figure.

Our insurer asks for a current certificate. Does that change things?

It changes what binds you in practice. An insurance condition or a repairing clause in a lease is a contractual obligation rather than a statutory one, but it is no less real. Check what yours actually says rather than assuming a number.

Is this the same as PAT testing?

No. This covers the fixed installation: the wiring, the boards, the fixed equipment. In-service testing of portable appliances is a separate exercise answering a different question.

We let commercial units out. Does the landlord duty apply?

The five-yearly statutory duty applies to rented dwellings, not to commercial lettings. Your obligations as a commercial landlord come from the lease and from the general duty to maintain, which is a different analysis.

Get a quote

Commercial enquiry

Premises type, roughly how many distribution boards, single or three phase, and when you can be without power.

  • No cost, and no obligation to book anything
  • We come back with a date or a question, not a sales call
  • A fixed price for the work described, in writing

Would rather talk it through? Leave a number in the form and say so in the details, and we will ring you rather than emailing back.

Summary of the condition of the installation
Extent of the installation coveredWhole installation, all circuits
Agreed limitationsConcealed cable, floors not lifted
Overall assessmentUnsatisfactory
Recommended next inspectionWithin 5 years

An unsatisfactory result starts a 28 day clock on a rented property. The report says what was found, so you can get it priced.

Example only. A real summary carries the property, the date and the signature.
Free quote
We call back rather than email a form letter
So we can check you are in our area
Roughly how many circuits, whether anyone is living there, and when the last inspection was

Your details are used to quote your job and nothing else. See our privacy notice.

CallArrange an EICR