Managed portfolios
EICRs for letting agents in Chesterfield
Forty properties means forty renewal dates. The duty sits with the landlord; the consequence of a missed date lands on your desk. What helps is not a cheaper inspection. It is one route to a qualified electrician, and dates that do not surprise anyone.
The duty rests with the landlord. The diary is usually yours.
Where is the property?
The postcode tells us whether we cover you.
What you are getting
Agents manage renewal dates, not inspections
Renewal dates visible before they are urgent
Five years is predictable. A missed renewal is a diary failure, not an electrical one, and it is the one that costs money.
One route rather than forty
A different electrician per landlord means a different format, lead time and conversation every time.
Reports that will stand up
With the schedule attached, ready for a tenant within 28 days or the authority within seven.
Straight answers on remedial work
An unsatisfactory result starts a 28-day clock. You need a clear account of what was found and what it will take, not a conditional estimate.
What you get
A report records circuits, codes and limitations
The verdict is the least useful part. What matters is the schedule of test results behind it, the coded observations, and an honest record of anything the inspection could not reach.
A ticked box and nothing else is a verdict with no working shown. Worth knowing before you accept one, whoever arranged it.
What the law says
Landlord duties carry fixed deadlines
England, privately rented homes. Every line is from the regulations themselves rather than from somebody's summary of them, and the sources are listed underneath.
| Inspection interval | No more than 5 years, or shorter where the report specifies |
|---|---|
| Report to existing tenants | Within 28 days of the inspection |
| Report to a new tenant | Before they occupy |
| Report to a prospective tenant | Within 28 days of a written request |
| Report to the local housing authority | Within 7 days of a written request |
| Remedial or further investigative work | Within 28 days, or sooner if the report specifies |
| Written confirmation the work is done | To tenants and the authority within 28 days of completion |
| Maximum financial penalty | £40,000, raised from £30,000 in 2025 |
This describes the law in England. The Welsh and Scottish positions differ, Scotland's repairing standard also covers portable appliances, which the England duty on private landlords does not. It is general information, not legal advice. Last checked against the primary sources on 27 August 2026.
How it works
A portfolio needs a calendar, not bookings
The work is in the scheduling. Better set up once than handled as each date turns urgent.
Send the portfolio and the dates
Addresses, and the expiry of any current report. That gives you a renewal calendar instead of a queue of emergencies.
We match capacity to the volume
A portfolio needs people who can work a schedule. If the volume is more than can be covered properly, we will say so.
Access through the tenancy, as you normally would
Notice, isolation and repeat visits work as they do for any contractor. Nothing changes your process.
Reports back, dates updated
Each with its schedule, and the next renewal date recorded so the cycle continues.
Areas covered
We cover eight towns across north Derbyshire
Chesterfield and north Derbyshire. Portfolios across this area frequently span several housing authorities, which matters when one of them makes a written request.
Do we cover your postcode?
Type the first part, like S40 or DE45. No need for the whole thing.
Who does the work
Every electrician clears six checks
We do not carry out the inspection. We put you in touch with an electrician who does. An EICR is worth what the person signing it is worth, so these checks are the product. Each is verified against the issuing body's own register, not taken from a logo.
Competent to inspect and test
Inspection and testing carries its own qualification. A good installer is not automatically the right person to sign a report.
Registered with a competent person scheme
Checked on the scheme's own public register, not a badge on a website.
Public liability insurance, in date
We check the certificate and the expiry date, not just that one exists. A lapsed policy is the most common reason to turn someone away.
Reports that carry their schedule
We look at an electrician's reports before sending them a job. The schedule of results is the part worth checking.
Working to the current standard
BS 7671 as currently amended. The 2026 amendment changed what makes a report unsatisfactory, and not everyone has caught up.
A public record worth reading
We read what previous customers wrote instead of counting stars. We publish no figure of our own, because we have none.
Scheme registration and insurance details come with your quote, so you can check them against the public register yourself. How we choose electricians sets out every check, including what gets someone turned away.
Next step
Scope a portfolio of renewals
How many properties, and how many already hold a current report.
Questions
Agent questions
Does the duty sit with us or the landlord?
With the landlord. The regulations place the obligations there, and the penalty follows them. The diary, the access and the fallout sit with you.
Can you take a whole portfolio at once?
It depends on the volume and how much is already current. Send the numbers and you get a straight answer on what can be covered.
What format do the reports come in?
A condition report with its schedule of test results, signed by the person who carried out the inspection.
How quickly does remedial work have to happen?
Within 28 days of the inspection, or sooner where the report specifies a shorter period, and the landlord must obtain written confirmation from a qualified person that it has been done.
Get a quote
Portfolio enquiry
How many properties, roughly how many hold a current report, and when the earliest renewals fall.
- No cost, and no obligation to book anything
- Your details are never sold on or passed around
- A fixed price for the work described, in writing
Would rather talk it through? Leave a number in the form and say so in the details, and we will ring you rather than emailing back.
Other situations
The same inspection carries different duties
The inspection is the same piece of work whoever asks for it. What changes is the duty attached, and whether there is one at all.
Landlord EICR
The five-yearly report every privately rented home in England must hold.
Read moreSocial landlord EICR
Extended to registered providers in 2025. First inspection due before 1 November 2026 for existing tenancies.
Read moreHomeowner EICR
No legal requirement if you own and live in your home. Useful when buying, selling, insuring, or when the board keeps tripping.
Read moreCommercial EICR
No statutory five-year interval exists for commercial premises. There is a duty to maintain the installation, and a frequency you set from risk.
Read moreHMO EICR
The five-yearly duty applies as it does to any rented home. A licensed HMO also has a licensing authority taking an interest.
Read more