Remedial work

A rewire is the least common outcome, not the default

Most unsatisfactory reports lead to targeted work rather than a rewire. Where a rewire is genuinely the answer, the report usually shows it in the insulation resistance readings rather than in the age of the property.

C1 or C2 findings across multiple circuits, or an installation whose readings show general deterioration.

Remedial

Where is the property?

The postcode tells us whether we cover you.

So we can check you are in our area
If your current report still has months to run, we would rather tell you that than book you in early.

What actually points to a rewire

  • Insulation resistance readings that are poor across the installation rather than on one circuit
  • Cable types that have degraded rather than simply aged
  • An installation extended so many times that no coherent circuit arrangement remains
  • Findings that repeat on every circuit, which makes circuit-by-circuit repair uneconomic rather than impossible

Full and partial are both real options

A partial rewire addresses the circuits that need it and leaves sound ones alone. It is common, it is legitimate, and it should be recorded properly so the next inspector knows what is new and what is not.

The argument for doing everything at once is disruption rather than compliance. Rewiring is the most invasive electrical work a house sees.

Age on its own is not a reason

An installation is reported against the current standard, not required to have been built to it. Old cable that tests well is old cable that tests well.

If a quote for a rewire rests on the year the house was built rather than on readings in a report, ask which readings prompted it.

Who does the work

Every electrician clears six checks

We do not carry out the inspection. We put you in touch with an electrician who does. An EICR is worth what the person signing it is worth, so these checks are the product. Each is verified against the issuing body's own register, not taken from a logo.

Competent to inspect and test

Inspection and testing carries its own qualification. A good installer is not automatically the right person to sign a report.

Registered with a competent person scheme

Checked on the scheme's own public register, not a badge on a website.

Public liability insurance, in date

We check the certificate and the expiry date, not just that one exists. A lapsed policy is the most common reason to turn someone away.

Reports that carry their schedule

We look at an electrician's reports before sending them a job. The schedule of results is the part worth checking.

Working to the current standard

BS 7671 as currently amended. The 2026 amendment changed what makes a report unsatisfactory, and not everyone has caught up.

A public record worth reading

We read what previous customers wrote instead of counting stars. We publish no figure of our own, because we have none.

Scheme registration and insurance details come with your quote, so you can check them against the public register yourself. How we choose electricians sets out every check, including what gets someone turned away.

Next step

Get the remedial work quoted properly

Send the report, or the codes from it, and the work gets quoted against what was actually found.

Get started

Questions

Rewiring questions

Does an unsatisfactory EICR mean I need a rewire?

Rarely. Most unsatisfactory reports lead to specific remedial work. A rewire is the answer where findings repeat across the whole installation.

How old does wiring have to be before it needs replacing?

There is no age at which wiring must be replaced. Condition is what is assessed, and it is measured rather than estimated from a date.

Can a rewire be done in stages?

Yes. Partial rewires are common and legitimate. What matters is that the work is certified and recorded so the installation's history stays legible.

Get a quote

Get remedial work quoted

What the report found, and the codes against it if you have them to hand.

  • No cost, and no obligation to book anything
  • Your details are never sold on or passed around
  • A fixed price for the work described, in writing

Would rather talk it through? Leave a number in the form and say so in the details, and we will ring you rather than emailing back.

Summary of the condition of the installation
Extent of the installation coveredWhole installation, all circuits
Agreed limitationsConcealed cable, floors not lifted
Overall assessmentUnsatisfactory
Recommended next inspectionWithin 5 years

An unsatisfactory result starts a 28 day clock on a rented property. The report says what was found, so you can get it priced.

Example only. A real summary carries the property, the date and the signature.
Free quote
We call back rather than email a form letter
So we can check you are in our area
Roughly how many circuits, whether anyone is living there, and when the last inspection was

Your details are used to quote your job and nothing else. See our privacy notice.

Arrange an EICR